Projects

Projects

May 2025
Fiber optic control cabinet installation for optical communication on the DolWin beta offshore converter platform
  • Concept creation
  • Procurement of all materials required for the project
  • Construction and adaptation of 3 fiber optic switch cabinets
  • Installation and cabling of the active and passive components
  • Splicing of the fiber optic cables
  • Transfer of the project documentation to the customer
May 2025
February 2025
Conversion of drinking water treatment from chlorine to UV on the offshore converter platform BorWin beta
  • Project planning for the system
  • Procurement of materials
  • Dismantling of the old system
  • Offshore installation
  • Installation and commissioning of the newly installed UV system
  • Creation and transmission of the documentation (circuit diagram, UV system manual, project report)
February 2025
February 2025
Replacement of six heating registers of the HVA-C system on the offshore converter platform HelWin beta
  • Procurement of materials
  • Dismantling of the old system
  • Installation of the new heating coil
  • Creation and transmission of the documentation
February 2025
June 2024
Pipe replacement on dual fuel RoPax ferry (Nils Holgersson)
  • Recording the damage to the entire system
  • Procurement of materials
  • Dismantling the damaged pipes
  • Installing the new pipes
June 2024
April 2024
Refit boat landing on the offshore converter platform BorWin beta
  • Steel construction prefabrication according to design specification
  • Acceptance of all prefabricated steel components by the classification society
  • Offshore installation of the prefabricated components in the air and water exchange zone
  • Installation of the prefabricated components by divers in the underwater area with DP3 vessel
  • Creation and transmission of the documentation according to customer specifications
April 2024
November 2023
Production and installation of assembly hatches on the offshore converter platform BorWin beta
  • Design creation
  • Fabrication of the assembly hatches
  • Factory Acceptance Test (FAT)
  • Offshore installation
  • Acceptance of all work by a classification society
  • Creation and submission of the project documentation
November 2023
July 2023
Installation of the air handling unit on the DolWin alpha offshore converter platform
  • Project coordination
  • Factory Acceptance Test (FAT)
  • Offshore dismantling of the existing system
  • Offshore installation of the new system
  • Commissioning of the system according to customer specifications
July 2023